Hardware scheduling & specification
Opening-by-opening hardware schedules prepared from drawings, door schedules and the project specification.
BOQ review & value engineering
Review of tender BOQs with alternatives that hold performance while meeting budget.
Technical submittals & samples
Datasheets, compliance statements, test certificates and physical samples for consultant approval.
Supply & logistics
Order consolidation, packing by floor or unit where required, and delivery to site.
Installation guidance & commissioning
Fixing instructions and on-site support, including setup and handover of digital locks.
Warranty & after-sales
Defect claims inspected and resolved by repair or replacement under the warranty terms.
Six steps, one supplier.
- Enquiry & drawings
- Hardware schedule
- Quotation
- Submittal & approval
- Supply & delivery
- After-sales
Quality you can submit, and a warranty you can rely on.
Every submittal is backed by manufacturer documentation. Where the project specification calls for it, we provide test certificates against the relevant European standards.
| Standard | Product |
|---|---|
| EN 1906 | Lever handles and knob furniture |
| EN 1935 | Single-axis hinges |
| EN 12209 | Mechanically operated locks and latches |
| EN 1303 | Lock cylinders |
| EN 1154 | Controlled door closing devices |
| EN 1125 | Panic exit devices |
| EN 179 | Emergency exit devices |
| EN 14846 | Electromechanically operated locks |
| EN 15570 | Furniture hinges |
| EN 15338 | Furniture extension elements (drawers) |
Applicable standards and certificates depend on the specific product and manufacturer, and are confirmed per item in the submittal.
Against manufacturing defects
Cover runs from the date of delivery under normal use and installation. Valid claims are inspected and, once the defect is confirmed, the product is repaired or replaced at Terra Titan’s discretion. Misuse, improper installation, unauthorised modification, accidents and normal wear are excluded.

